Skip to content
Get a fixed price

Kitchens · lofts · extensions

Fixed price, named manager, finished on the agreed date

Fourteen years of kitchens, lofts and extensions across Leeds and Harrogate, about 60 a year, each with one price that doesn’t move and a manager you can ring.

Since 2012Leeds & HarrogateFixed-price only

A finished kitchen with pale oak cupboards and a long island, open through glazed doors to the garden
Roundhay, Leeds5 weeksFinished on the date

The numbers

What 14 years in Leeds adds up to

Counted from our own job ledger and our public Google reviews, not from a brochure.

94%

of jobs finished on the agreed date, the one written down before work started

5 wks

the average kitchen, from strip-out to the first meal cooked in it

4.9 / 5

on Google, from 180 reviews by homeowners in Leeds and Harrogate

What we do

Three jobs we do about sixty times a year

Kitchens in about five weeks

The average kitchen is done in 5 weeks, strip-out to first meal, with joinery, electrics, plastering and tiling run by one manager.

Average 5 weeks

Loft conversions with the dormer done right

Dormer or roof-window rooms, a staircase that fits the landing, and the drawings and building control handled for you.

Plans and sign-off included

Rear extensions priced before the digger

Single-storey kitchen-diners and garden rooms, with one written price agreed before any ground is broken.

One written price
A Hadley & Fox project manager in a hard hat checking drawings on site

Your project manager

One person answers, from the survey to the snagging

Every job gets a named project manager before it starts. They write the price, book the trades, walk the site with you each week and sign the job off. One number to ring, not a different trade each day.

  1. 01

    Survey at your house

    We measure up, talk through what you want and what the house allows, and name your project manager.

    Week 1
  2. 02

    One fixed price, in writing

    Every line itemised. The number you sign is the number you pay; if you change the plan, you get a new line, not a surprise.

    Week 2
  3. 03

    The build, with an agreed finish date

    Trades booked back to back by your manager, a site walk with you each week, the finish date in writing first.

    5 to 14 weeks
  4. 04

    Snagging and sign-off

    You walk the finished room with your manager, list anything that isn’t right, and we fix it before the last invoice.

    Final week
A homeowner cooking at the window of her newly finished kitchen
Google reviews

Rated 4.9 on Google by 180 homeowners

4.9 on Google from 180 reviews, every one a real job in Leeds or Harrogate. Read them before you ring us: we’d rather you knew what to expect from week one.

Read the reviews

Get a fixed price

Tell us the job, get one price in writing

SurveyA project manager comes to your house in Leeds or Harrogate, measures up and listens.
PriceOne itemised fixed price, in writing, with a start date and a finish date on it.
0113 000 0000

Book a survey

A reply from the project manager who’d run your job, usually within two working days.